Manufactured Gas Plant - Petroleum Remediation
Project Details:
Type: Environmental Remediation
Location: Fall River, MA
Description: Remediation was required for a former Manufactured Gas Plant facility located in Massachusetts. Organoclay was added to oily material to bind petroleum prior to stabilization with Portland Cement. Type of Project – In Situ Stabilization.
JCE Product: Organoclay (EnviroTROL)

